星空体育官网

星空体育官网:
Position:星空体育官网:Dynamic news > Project News

Project News

Tanzania Marvini 7MW WHR project of 4100t / d cement production

Date:2022-04-05
During the Lunar New Year, Tanzania Marvini 7MW WHR project of 4100t / d cement production , which is generally contracted by Shanghai Triumph Energy Conservation Engineering Co., Ltd.,(STEC), has successfully completed the civil construction work. All members of the project department and the owner have made concerted efforts to officially start the installation work of the waste heat recovery, aiming to complete the power synchronization in August 2022 and help the owner solve the difficulties of electricity shortage in Tanga, achieve the goal of annual electricity saving of 55.7 million kilowatt hours, annual saving of 17,500 tons of standard coal and reduction of annual CO2 emission of 43,000 tons. Tanzania Maveni project is the first African cement WHR project undertaken by STEC and it is also a major project beneficial to the energy conservation and emission reduction of the China and Africa. The members of the project department dispatched by the company have been stationed since October 2021, overcoming the difficulties of personnel construction, local recruitment, resource scarcity, and dangerous public security caused by novel coronavirus, and greatly increasing the difficulty of civil construction and the workload of material inventory. In order to ensure the smooth development of the project, STEC dispatched 10 installers to the site before the Lunar New Year, gradually conducted the inventory of incoming equipment and materials, and proceeded to prepare for the boiler installation, equipment hoisting in place in the main plant, non-standard equipment production and other pre-installation preparations. Although there are many difficulties on site, all members of the project department strive to stick to the first line, take into account the epidemic prevention and control and construction management at the same time, and constantly solve the sudden problems in the process of project construction, so as to contribute to the establishment of "energy-saving and environmental protection quality project" of Triumph Group in the African market.