星空体育官网

星空体育官网:
Position:星空体育官网:Dynamic news > Project News

Project News

Shengshi New Energy WHR project was Synchronized at One Time

Date:2023-12-13
At 13:33 on December 03, 2023, Anhui Shengshi New Energy Material Technology Co., Ltd. (referred to as "Shengshi New Energy") 6MW glass line WHR project, contracted by Shanghai Triumph Energy Conservation Engineering Co., Ltd. (referred to as "STEC"), was successfully synchronized to the grid at one time.

Based on the production situation and flue gas conditions of Shengshi New Energy Glass Kiln, a free switching between boiler, heat exchanger, and environmental protection system is adopted in the process flow to more flexibly adapt to the changes in flue gas conditions. The STEC project department adheres to the work style of "pursuing excellence and creating first-class". During the construction, commissioning, and grid connection, it always adheres to the site, coordinates internally and externally, and ensures the stable operation of various systems, normal parameters, and good indicators.
After the project is put into operation, it can achieve an annual power generation of about 44,64 million kilowatt hours, save about 17,900 tons of standard coal, reduce CO2 emissions by about 44,500 tons, and bring considerable economic and social benefits to Shengshi New Energy. STEC adheres to the development concept of "green and low-carbon, digital intelligence, integrity and innovation", and works together with Shengshi New Energy to achieve national lucid waters and lush mountains.