星空体育官网

星空体育官网:
Position:星空体育官网:Dynamic news > Project News

Project News

Yiliang Jinzhu Cement 2500t/d×2 Clinker Production Line WHR Project

Date:2013-07-22

This project owns 2*2500t/d cement clinker production lines. And the both lines are equipped with WHR units. They are designed with 4 boilers and 1 turbine. The turbine& generator’s installed power capacity 10MW.

This project’s construction period is about 9 months. And it is started on 15th July. On 1st March, and connected to the grid on 6th July. The project passes the performance test on 19th July, 2013.