星空体育官网

星空体育官网:
Position:星空体育官网:Dynamic news > Project News

Project News

Luanxian Panshi Cement’s 5000t/d Clinker Production Line Waste Heat Electricity Saving Project

Date:2013-05-09

This project is STEC’s 1st EMC project. It’s designed with 2 boilers and 1 turbine with 10 MW installed power capacity.

The project is started on 1st March, 2012. And on 7th April, the project passes the 72 hours’ trial running.