星空体育官网

星空体育官网:
Position:星空体育官网:Dynamic news > Project News

Project News

Xiushan Sanlei Cement 2500t/d Clinker Production Line WHR Project

Date:2013-10-29

This is a 2500t/d clinker production line equipped with WHR unit in EPC construction mode. It’s designed with 2 boilers and turbine. The turbine& generator’s installed power capacity is 5MW. The project’s total construction period is 9 months. The project is actually started on 20th November, 2012, and realized with electricity generating on 28th August. The project passes the performance test on 27th October, 2013.